Motorists in Deira now have a signal-free route between Infinity Bridge and Al Mamzar following the opening of the 1,650-metre Al Khaleej Street Tunnel by the Roads and Transport Authority (RTA). Featuring three lanes in each direction, the tunnel extends from the end of the Infinity Bridge ramp to the intersection of Al Khaleej Street and Al Wuheida Street, carrying up to 12,000 vehicles per hour.
The upgrade removes surface bottlenecks for residents in Abu Hail, Al Wuheida, and Al Mamzar, while improving access to Dubai Islands, Waterfront Market, and Al Hamriya Port. Alongside the tunnel, the RTA converted roundabouts on Cairo Street and Al Wuheida Street into signal-controlled junctions and connected the bridge ramp from Dubai Islands directly into the new tunnel corridor.
His Excellency Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors of the RTA, said the tunnel marks a major step in the 13-kilometre Al Shindagha Corridor Improvement Project. Serving roughly one million residents across 15 upgraded intersections, the wider corridor will slash journey times from 1 hour 44 minutes to 16 minutes by 2030.
Inside the tunnel, drivers pass a continuous mural created by Emirati artist Maryam Al Hathboor under the Dubai Tunnels initiative. Composed of 35 million mosaic pieces, the installation depicts Dubai's skyline, including Infinity Bridge, in fine-line detail inspired by banknote engravings. During construction, 77% of excavated materials, amounting to about 522,000 cubic metres, were reused across other infrastructure sites.